verve

How long does a small business website take?

With Verve, about two weeks from a 20-minute call to a finished website you can click through on your own phone. Here is what happens on each of those days, and why most website projects take months instead.

A glass hourglass filled with swirling clay-coloured ink on white, representing the timeline of building a website.

The short answer

StageWhenWhat you do
A 20-minute callDay 1Talk about your business
The build: design, copy, photos, codeDays 2 to 13Nothing, unless we have a question
The finished site, ready to reviewDay 14Click through it and decide
Going liveOnce you say yesNothing: we connect your domain

Bigger projects, like an online store or a booking system wired into other software, take longer and get their own quote and timeline. We say so on the first call.

Day 1: a 20-minute call

The call is where the website gets its brief. We ask what you sell, who buys it, what customers ask you before they buy, what you want a visitor to do (call, book, visit, order), and what's already in place: a logo, photos, a domain, a Google Business Profile, an old site. That's enough to start. You don't need to write anything down beforehand or send a folder of files.

Days 2 to 13: the build

This is the part that takes the time, and it all happens on our side:

You might get a question or two by email (a price, your hours, a spelling). That's all we need from you in those twelve days.

Day 14: you see the real thing

Not a mockup, not a wireframe: the finished website, on your phone and your laptop. Take as long as you like. If something should change, it changes. If you love it, it's $500 once and $100 a month, and it goes live. If you don't, you walk away owing nothing.

Why ours takes two weeks and most take longer

A typical project spends more time waiting than building, and the waiting comes from three places.

The mockup loop. The usual process is draft, feedback, revised draft, feedback, approval, and only then the build. Each round is two waits stacked: your reply, then the designer's turnaround. The arithmetic is unforgiving. Three rounds at four days for your reply and three days for theirs is three weeks of waiting before anything is built. We skip that loop: you see the finished site first and ask for changes to something real.

Waiting on content. Many projects stall on "send us your copy and photos." Writing a website is hard, and it lands on the person with the least time: you. We write it, from the call.

Hand-offs. At an agency, a project can pass from sales to a strategist, a designer, a developer and a project manager, with a queue at each desk. At Verve, the person on your call is the person who builds your site.

What slows down any website, whoever builds it

Whichever route you take, these move the date more than anything else:

  1. How many people have to approve it. Every extra decision-maker adds a round.
  2. How fast feedback comes back. A week to reply to "does this look right?" is a week added, every time.
  3. Scope that grows mid-project. "Can it also take bookings?" is a reasonable question and a new project.
  4. Accounts nobody can find. The login for the domain you registered years ago, the email that owns your Business Profile. Find them early; they're needed to go live.

Five questions to ask any designer about timing

And if you're building it yourself

A website builder can have a page online in an afternoon. The time goes into everything around it: writing the copy, finding photos, deciding what goes on which page, and finishing it around a full week of running a business. If your content is ready, it can be fast. If it isn't, that's where the weeks go.

If two weeks sounds about right, here's exactly how the no-upfront-cost process works, and if you're a Calgary business, here's the local version. Or book a free 20-minute call below, and day 1 starts there.

Free to start · 20-minute call · Pay only if you love it